add progress and summary data Loader Job_Message field

XMLWordPrintable

    • Type: Improvement
    • Resolution: Unresolved
    • Priority: Minor
    • None
    • Affects Version/s: 2.4.0
    • Component/s: daemon, grouperLoader
    • None
    • Environment:
      containerized grouper

      as mentioned to Chris in slack:

      In loader log for the loader job entry where the sum of ins/upd/del/unres/etc are stored for all the sub jobs… it would be great if the job message could provide a synopsis of progress and a final tally. X of Y groups processed (N%). (and that message would be left at the end of the job for 100%).

            Assignee:
            Chris Hyzer (upenn.edu)
            Reporter:
            Michael Gettes
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated: